There is no two ways about it, we have definitely been battling the weather with this years big project. Days 2 and 3 were a complete write off. We are happy to wrap up warm and get on with the work but 70 mph winds and snow blowing horizontally is not what you need up on scaffolding to the roof line of a two story building.

Day 4 wasn’t much better but we did manage 10 minute intervals between the storms.
So day 5 and 6 have been flat out. Still strong winds but at least we have made some progress. The tiles and old rotted sarking board has been removed off the first area and replaced with Stirling board.

That was then covered with a water proof membrane.

The first few sheets of steel added and the scaffolding shuffled along the building ready for tomorrow.


We are just hoping the weather gods will be with us and this wind will finally drop so we can make more progress.